![]() |
BRS Chute Installation for the Monarch G |
![]() |
Red line is the line from the axle to the parachute. The purple line is the activating handle |
![]() |
Rocket to parachute attachment, BRS parachute cover is still open. This is a BRS 900 installation. |
![]() |
Rocket to parachute attachment |
![]() |
The position of the firing handle |
![]() |
A view of the attachment to the axle.... the axle has been removed in this photo, and shows the collar that the axle will go thorugh with the wheel attached. |
![]() |
Bridle extension to have chute well away from the craft. |
![]() |
The BRS Wing Root fittings and cover. The center section is covered with 1.7 oz cloth. This wing root faring is for the BRS 900. |
![]() |
The hole for the Parachute. Becuase of the size of the hoel reinforcements where necessary along the side of the fuselage. |
![]() |
The rocket parts ready for installation |
![]() |
The main bridle has two lines connected to the axle. The picture shows the axle partially installed with the wheel missing. |
![]() |
The plastic nut installed on the activating handling cable. |
![]() |
Attachment to the parachute |
![]() |
The shear pin installed in the launch tube. |